Ibahn
Sub Contractor: Allan Interiors
Client was keen to change the look of their entrance leading into Reception. We were asked to come up with a design that would look good and allow more light through.
Start
Existing wall was a fire protected corridor. To comply with Building Regulations glazed partitioning installed required 60min Insulation and 60min integrity.
Computer Image supplied to Client
A digital 3D visualisation of the design was presented to the Client.
Complete
Removed existing electrics and relocated. Cut a hole into existing wall and removed some floor tiles then built partition from sub-floor.
Client: Very Satisfied
Site Works Completion: 4 Days