World Wide Engineering
Main Contractor: Allan Interiors
Remit was to design and build 2(No) offices underneath an existing mezzanine structure. Submitted drawings to Building Control. Obtained Building Warrants. Commenced site works. Responsible for partitions, flooring and decoration (electrics by Client).
Existing
1st Phase
Lined out existing block walls with plasterboard. Installed Tenon Partitioning with window modules half height, double glazed with integral blinds. Oak doors with glazed vision panels.
Complete
Taped and filled joints for a monolithic finish. Decorated with white emulsion with exception of feature wall. Client requested something bold and striking. Opted for bright orange (similar colour to company’s logo) and to have Company’s Ethos printed centre.
To finish, new floor tiles were laid inside the offices.
Client: Very satisfied
Site Works Completion: 2 Weeks
< back to project gallery

|