Installation of office and industrial partitioning systems, suspended ceilings, fire protection, lighting, decoration, mezzanine platforms, raised modular access floors and other associated products.
Project Gallery

World Wide Engineering

Main Contractor: Allan Interiors

Remit was to design and build 2(No) offices underneath an existing mezzanine structure. Submitted drawings to Building Control. Obtained Building Warrants. Commenced site works. Responsible for partitions, flooring and decoration (electrics by Client).

Existing

World Wide Engineering World Wide Engineering World Wide Engineering

1st Phase

World Wide Engineering

Lined out existing block walls with plasterboard. Installed Tenon Partitioning with window modules half height, double glazed with integral blinds. Oak doors with glazed vision panels.

Complete

World Wide Engineering World Wide Engineering World Wide Engineering

Taped and filled joints for a monolithic finish. Decorated with white emulsion with exception of feature wall. Client requested something bold and striking. Opted for bright orange (similar colour to company’s logo) and to have Company’s Ethos printed centre.

To finish, new floor tiles were laid inside the offices.

Client: Very satisfied

Site Works Completion: 2 Weeks